Industry Portal «PRO PUMPS» - pumps and pumping equipment .

ru en fr cn es it ja de  
Make home page Add to Favorites
Pumps
Username: Password: Forgot your password
Sign up

Add a company
HomeCompanies

Mounting organization - [12]
Drilling Company - [62]
Domestic water supply - [13]
Sewerage, drainage, sewerage - [21]
Water & Wastewater - [58]
Hydromassage - [2]
Municipal water supply - [8]
Landscaping, fountains, ponds - [24]
Industrial water supply - [28]
Automatic irrigation systems - [60]
Heating systems - [42]
Construction of swimming pools - [15]

Education - [1]

The organizers of exhibitions - [14]

Domestic manufacturers of pumping equipment - [156]

Distributors - [63]

Representative offices of foreign manufacturers of pumping equipment - [102]

Manufacturers of spare parts for pumps - [27]

Manufacturers of related equipment for pumps - [19]

Media - [6]

Trade Organizations - [26]
Wholesale dealers are regional - [46]
Retail - [306]
Armature - [22]
Online Stores - [26]

Services - [3]
Diagnosis and repair - [6]
Engineering survey - [8]
Employment Agencies - [5]
Equipment Leasing - [1]
Software - [2]
Certification - [1]

Pumps
All companies heading "Drilling Company"

LLC Aquadrom

Rating the company: 3.00 Σ 2 Rate
Drilling Company LLC Aquadrom 7 (81378) 93-607 1888 00, Leningrad, Vyborg, st. Physical training, 17, (SKTB GALS), office № 311. www.aquadril.vyborg.ru



City: Viborg

Phone: +7 (81378) 93-607

Mobile: 8-921-403-08-22

Mailing address: 188800, Leningrad Region, Vyborg, st. Physical training, 17, (SKTB GALS), office № 311.

Company website: www.aquadril.vyborg.ru

E-mail: available upon registration

Contact person: available upon registration

Company Description

Our firm has only one in the north-west of modern plant for drilling, to the best of Finnish firms. Installation of Atlas Copco (Sweden) based on the a / m Mercedes, as a rule, allows to drill a well for water depths up to 100m in one day, if deeper, then for two days.

The method of drilling - with simultaneous immersion hammer casing for loose rocks. Impassable rocks as loose and rocky, are ground into dust and blown to the surface of the compressor installation.

ROP when drilling with casing is 2 ÷ 6 meters / hour, depending on the nature of the soil during drilling without casing, open hole in the rock is 15 ÷ 25 meters / hour, depending on the hardness of the rocks.

After registration, this page will be either a button for editing, or the link to request the transfer of management of the company for you.